All insights
Planning & optimisation

Production planning that re-plans when the day changes

Orders, machines, people and shift calendars in one timeline. An optimiser proposes a plan that respects every constraint — the planner compares, adjusts and decides.

Building blocksProduction Optimizer
The problem

A plan is only good until the first change

A machine goes down, an urgent order arrives, a colleague is off sick — and the plan that took the morning to build no longer holds. In many workshops that plan lives in a spreadsheet and in one person's head, which makes every change expensive.

Dokiny's Production Optimizer puts orders, machines, people and shift calendars into one timeline and adds an optimiser that proposes a plan under all constraints. When something changes, re-planning takes a click instead of a morning. The planner stays in charge: the optimiser proposes, a person compares and accepts.

Early shift 06–14Late shift 14–22Night shift 22–06
Press 1
Order 1041Order 1047Order 1052
Press 2
Order 1043Order 1049
Assembly
10411047Order 1049
Packing
104110471049
Illustration: resources as rows, time as columns, one bar per operation. The night shift is shaded.
How it works

From data to an accepted plan

  1. 1

    Bring in the data

    Resources and jobs entered by hand or imported from CSV with a mapping wizard.

  2. 2

    Set the calendars

    One-, two- or three-shift templates per resource, plus exceptions such as holidays.

  3. 3

    Optimise

    The optimiser builds a proposal for the chosen objective within the planning horizon.

  4. 4

    Compare

    Key figures before and after, and the constraints that limit the plan, in plain words.

  5. 5

    Decide

    Accept the proposal, adjust it by drag and drop, or keep the current version.

Capabilities

What the planner works with

Timeline with day and week zoom

Resource rows over a time axis, with shifts, non-working time and a today marker.

Drag and drop

Move operations between resources and time slots, snap to 15, 30 or 60 minutes, resize to change duration.

Live conflict detection

Double bookings, capacity overruns and missed due dates are flagged as they happen — and stay flagged if overridden.

Backlog

Unscheduled jobs wait in a side panel and are dragged onto the timeline.

Workload view

Planned hours against capacity per resource and day; overload shows in red.

Locks and versions

Fix what must not move before optimising, and keep plan versions to go back to.

Where it fits

The module is aimed at job-shop, workshop and series production. It runs on its own with imported data; connected to an MES, orders and machine states can come from the systems you already have.